Cranes and crane-type equipment are used throughout natural gas pipeline construction to unload and position pipe, lower welded pipe strings into trenches, lift heavy sections over roads and waterways, and set heavy equipment at valve sites and compressor stations. Side boom pipelayers handle most of the work along the right-of-way, while crawler, rough terrain, and mobile cranes take on heavier or more specialized lifts.
Natural gas pipelines move energy over long distances, and building them is a heavy-lifting job from start to finish. Steel pipe is long, heavy, and awkward to handle, and the stations along the line contain large pieces of mechanical equipment. Here is how cranes fit into each stage of the work.
1. Handling and Positioning Pipe Along the Right-of-Way
What it is: The right-of-way is the cleared corridor where the pipeline is built, and pipe is delivered, strung out, and prepared along it before welding and burial.
Cranes and side booms unload pipe joints from trucks and place them in line along the trench path (often called “stringing”). Once sections are welded together, equipment is needed again to hold, align, and move them. Reliable lifting equipment keeps this stage safe and moving quickly, even on long, remote corridors.
2. Lowering Pipe Into the Trench
What it is: Lowering-in is the process of lifting a welded pipe string and gently setting it into the prepared trench.
This is where side boom pipelayers are most commonly seen. Several side booms often work in a line, lifting the pipe together so it is lowered evenly without bending or damaging the coating. Because the weight and balance of a long pipe string matter, proper rigging and coordination between operators are essential.
3. Crossings: Roads, Rivers, and Obstacles
What it is: A crossing is a point where the pipeline must pass under or over a road, railroad, stream, or other obstacle.
Crossings frequently call for larger or more specialized lifting equipment. Crawler cranes and mobile cranes may be used to position longer or heavier pipe sections and to support equipment during crossing work, depending on the site and design.
4. Setting Equipment at Valve Sites and Stations
What it is: Stations and valve sites are facilities along the pipeline that contain equipment such as valves, meters, regulators, separators, and compressors.
Compressor stations, regulator stations, and meter stations all involve setting heavy, high-value equipment onto foundations. Mobile cranes and all-terrain cranes are commonly used for these lifts because they can handle precise placements. Our oil and gas crane services support this kind of work, from installing new equipment to relocating or replacing components during maintenance.
5. Facility Maintenance and Shutdowns
Once a pipeline or station is operating, cranes are still needed for maintenance, equipment replacement, and planned shutdowns. Heavy components such as compressors, coolers, and other station equipment often have to be lifted out and replaced within tight schedules, which makes careful lift planning especially important.
Types of Cranes Used in Pipeline Work
| Equipment | Typical use |
|---|---|
| Side boom pipelayer | Lifting and lowering pipe along the right-of-way |
| Crawler crane | Heavier lifts and work on soft or uneven ground |
| Rough terrain crane | Mobile lifting on off-road job sites and rural corridors |
| All-terrain or mobile telescopic crane | Setting equipment at stations and facilities |
| Overhead crane (inside buildings) | Maintenance lifts within compressor or processing buildings |
You can learn more about the cranes we use in our crane equipment overview.
Common Challenges on Pipeline Projects
- Remote and uneven terrain: Soft, muddy, or sloped ground can limit crane access and may require mats or ground preparation.
- Long, heavy loads: Pipe strings must be balanced and rigged correctly to avoid damage or instability. Avoiding common rigging mistakes is especially important here.
- Weather and wind: Open corridors are exposed to wind and rain that can pause lifts.
- Hazards near live lines and utilities: Overhead power lines and existing pipelines must be identified and avoided.
- Tight schedules: Delays on one stage of a pipeline project can ripple across the whole job.
Safety and Regulations
Pipeline work follows both general crane rules and standards for specific equipment. For example, OSHA’s standard 1926.1440 covers sideboom cranes in construction, and pipeline operations are overseen by agencies such as PHMSA. Operators and riggers should be properly trained and qualified, and you can learn about certification through NCCCO. To see how safety is built into every lift, read about our crane safety approach.
Frequently Asked Questions
What type of crane is used to lay natural gas pipeline?
Side boom pipelayers are the most common equipment for lifting and lowering pipe along the right-of-way, while crawler, rough terrain, and mobile cranes handle heavier or more specialized lifts.
How is pipe lowered into a trench?
Several side booms usually lift a welded pipe string at once and lower it evenly into the trench so the pipe and its coating are not damaged.
Are cranes used at compressor stations?
Yes. Cranes are used to set compressors, coolers, and other heavy equipment during construction, and again during maintenance, replacement, and relocation.
What are the biggest challenges of crane work on pipeline projects?
Common challenges include remote or soft terrain, long and heavy loads, wind and weather, hazards from nearby utilities, and tight project schedules.
Need Crane Support for an Oil and Gas Project?
From pipeline corridors to compressor stations, careful planning keeps lifts safe and on schedule. Contact MHM Cranes LLC for a free quote.